Okay, you want to build a house. But the three little pigs did too. And we all know what happened to them. Two of the pigs had the dumb idea to build their houses out of straw and sticks.
The other pig built a well-thought-out house of brick. When the wolf came along, the only house left standing was the one that was carefully built—brick by brick. Just like the three little pigs, to protect your future, you need to build a budget —brick by brick—before you build a house. Change orders are work items that need to be added or removed from the original set of plans. Next in line are the fees for water and sewer inspections, which will, ahem. Pro tip: Have your architect and builder develop the plan together.
Remember, Uncle Sam wants his share too. Foundation work is where the real fun begins! Breaking ground, or excavation, requires heavy-duty equipment and expert operators to make sure the land is level before laying the foundation of your house. And know that if a bunch of large rocks are hiding beneath your plot of land, excavation costs could shoot up. After excavation, your builder will lay the foundation for your home, which usually includes lumber and concrete.
Your house could also need retaining walls installed to hold back surrounding soil from crumbling and falling onto your foundation. The foundation sets up the success of every other building phase. Casually throwing together a "straw-and-stick" budget here could crush you with unexpected costs! So plan on these expenses, folks! If the homes in your intended area are too big, too small, or not quite right, you might consider building a house from scratch.
But the materials you use, labor costs in your area, and customization choices will influence your final price tag. Depending on the size of your home and the customization you need, it could be cheaper to build a new house.
Credible allows you to easily compare mortgage rates from our partner lenders without leaving our platform. Find Rates Now. The cost of building a new home varies, based on a number of factors. The tables below use data sourced from HomeAdvisor. The size of your new home will greatly influence the cost. Most new homes in measured between 2, and 2, square feet, according to HomeAdvisor.
Location impacts the price of construction in a few ways. The same house in one state might cost twice as much to build as it would in another because of variations in the cost of labor, materials, regulations, and permit requirements. Plus, the actual site of the home — with its unique size, shape, soil, and climate — will also impact the cost. For instance, steep slopes or poor soil will typically require more engineering and foundation work.
Larger homes that require more customization cost more than smaller homes that are built using prefabricated pieces. But the cost is heavily influenced by the quality of the material you choose. Tiny homes are generally considered dwellings of less than square feet. Another option in this arena is to purchase a new prefabricated tiny home. They can be delivered with or without interior walls. If a tiny house is too small for your family, you could build something that qualifies as a small house to save money.
Other options for building a guest house include tiny homes, container homes, and modular homes. In many cases, one of these could be cheaper and finished out faster. If you already own the land, the total cost of building your own home will compare better to buying a home. The seller's real estate agent and appraiser will determine the sales price when buying a home. Also, your location will factor in considerably into the final price. This price does not include the cost for land or a septic system and water and electrical lines for new construction—if you are building in a rural area.
The main difference is that you'll be getting a brand new home instead of one that may be 20 to 60 years old. Another significant element in the cost to build a house is the price of the land, unless you already own a plot where you would like to build your home. Your location could make a difference of millions.
The cost to build a house on your own land could still be higher than buying an existing home, because of the cost of a land survey , grade the land, put in a septic tank, bring utility lines and systems to the property, etc. Compared to buying in a subdivision that is being developed, you have a lot more control and influence on the project when building a custom home with your selected general contractor.
However, you'll also have a higher degree of responsibility and decisions that will need to be made along the way. Unless you are well acquainted with everything that needs to be done, the following checklist will help you navigate the home building process with confidence.
You will need to contact a lender and figure out what kind of mortgage you will qualify for. You will need to find the right spot for your new home. If you are buying a plot that currently has a house which will need to be demolished, you will save a little when it comes to electrical and sewer connection fees, since those would have already been in place for the previous home.
If you are buying raw, undeveloped land in a rural setting, you might have to add a septic tank for your wastewater needs. You will also need to run utility lines back to your property, and possibly factor in the cost of grading the land and laying a driveway. In most cases, the budget for your project will determine the type of construction to be undertaken for the new home. In addition to traditional construction methods, others available include complete prefabricated homes, modular homes, home kits, barndominiums, container homes, pre-built tiny homes, and the newest process—3D printed home structures.
Your contractor can accurately schedule out the inspections that will need to be carried out during construction. For the most peace of mind, select a contractor who has adequate insurance to cover the project through all phases of construction. With your land purchased and prepared for construction, your construction loan approved, budget finalized, plans drawn up, your contractor selected, and your permits approved, your contractor can be scheduled to break ground and begin the prep work for the foundation as the first phase of your construction.
Once built, you or your contractor will need to schedule a final inspection to obtain a certificate of occupancy. This is the official document that verifies that all work on the home was done to code and the structure is safe for people to live in. You can either wait until the entire home is complete before getting the landscaping done or start as soon as the foundation and framing of the house are finished. The other major factor at play regarding when this will take place is related to what you are having planted on your property in respect to trees, plants, and shrubs and what time of year they are best planted in.
Get free estimates. How much will your new house cost? Here are the average costs to build a single-family home by square footage. Additional Price Factors When looking at prices to build your own home, the average prices we have listed here are just averages, and with the range of customization possible, there is a potential for the final price for your home to differ significantly depending on where you live and the options you choose.
Some of the more significant pricing implications include Land — In addition to the cost of the land, when you buy your own lot, you'll need to have the land cleared and yard graded for construction. Size — More square footage equals a higher cost. Number of Stories — The cost to design, build, and develop home with two or more stories will add to your overall cost.
Adding high-end granite countertops or hardwood flooring come at an additional cost.